The production-control layer now persists capability state and production-job stages while public publishing remains founder-gated.
Review Residence camera-node production alongside the current Kidz Kolorz, Mythos and Narrative render baselines. Public publishing remains off.
Open Enterprise ReviewArrival hierarchy, cliff-carved black-glass facade, elevated private water level, waterfall-to-main-pool relationship, guest sightline control, pool-house placement and rear city horizon are locked as the visual reference standard. Concept reference only; not Revit/Twinmotion or construction geometry.
Open Residence v9Each node now has a camera-specific brief, provenance contract, QA rubric and founder approval gate. Concept references do not count as completed renders until formally ingested.
Open Residence ProductionGuided camera transitions, drag-look, zoom, level isolation, technical/dollhouse mode and restricted-zone controls are live. No external tour or media service is required.
Open Real-Time ResidenceWall segments, openings, paired stairs, glazing, water architecture, cliff geometry, arrival routes, terraces and structural elements are now the live review basis.
Open Residence v12Envelope, glazing frames, rails, ceilings, fixture/furniture proxies, pool construction, landscape, lighting and collision-constrained movement are layered onto the AWS-hosted architectural mesh. Public publishing remains gated.
Open Residence v13The Residence now emphasizes cliff-integrated black-glass massing, ceremonial arrival lighting, fountain depth, willow guest approach, rear terrace layering, private-to-public waterfall continuity, pool entertainment detailing, landscape density and city-facing dusk depth. Final visual readiness is still gated by material and base-mesh fidelity.
Open Residence v14Family charter, site criteria, architectural program, capital categories, architect handoff, technology/AI governance, privacy/security, operations, procurement, resilience, KORE.I boundaries, legal decision points and construction phasing are deployed. Property acquisition, spending and legal commitments remain gated.
Open House Realization ProgramJaelin architecture/technology, Rasheeda administration/documentation, family-use input, property prescreening, consultant scopes, capital inputs, room digital-twin records and construction phase gates are now structured. No outreach, property action or financial commitment is enabled.
Open House Command Center